Kingfish Lodge – Whangaroa Harbour

Kingfish Lodge – Whangaroa Harbour

ServiceDesign & Build  ClientKingfish Lodge 2016 Ltd Construction Period2020 onwards Architect+MAP Architects EngineerDHC Consulting Project Details Kingfish Lodge is a work in progress undergoing a dramatic redevelopment while retaining its rich history and...
22 Karori Cres

22 Karori Cres

ServiceDesign & Build  ClientCountrywide Properties Construction PeriodJuly 2022 – October 2024 Value$35M Architect+MAP Architects EngineerDHC Consulting Project Details 6 apartments over 5 levels constructed on a vertical hillside with internal carparking...
One St Stephens

One St Stephens

ServiceDesign & Build  ClientCountrywide Properties Construction PeriodMay 2022 – October 2024 Value$75M Architect+MAP Architects EngineerDHC Consulting Project Details 27 luxury apartments over 6 levels with 2 basement level carparks complete with internal...
Sealink HQ

Sealink HQ

ServiceDesign & Build  ClientWynyard West Limited Construction PeriodApril 2023 – July 2024(2 stages) Value$10M ArchitectArchitectus Auckland EngineerDHC Consulting Project Details Design & Build 2 suspended levels (500sqm foot print) of ComFlor...
Wairua Apartments

Wairua Apartments

ServiceDesign & Build ClientCountrywide Properties Ltd Construction Period2021 – 2023 Value$21M Architect+MAP Architects EngineerDHC Consulting Project Details Design & Build5 level building on a basement carpark with 12 apartments and 2 penthouses...
Elm Apartments – Remuera

Elm Apartments – Remuera

ServiceDesign & Build  ClientCountrywide Residences Construction Period2020 – 2022 Value$26M Architect+MAP Architects EngineerDHC Consulting Project Details Design & Build 4-level building (12 apartments and 1 penthouse occupying the entire top floor)...
The Spire – Christchurch

The Spire – Christchurch

ServiceDesign & Build  ClientKilmore Property Trust Construction PeriodNovember 2019 – November 2021(Covid disruption) Value$38M Architect+MAP Architects EngineerDHC Consulting Project Details Design & Build Nine level building consisting of 2 parking...
Kings Square – Newmarket

Kings Square – Newmarket

Service Design & Build (Structural and Services) Client L&Y Holdings  Construction Period October 2007 – December 2009 Value $30M – this was stage 3 of a $94M project Architect Q Designz Engineer DHC Consulting Ltd Project Details Design &...
Outlook Mission Bay

Outlook Mission Bay

Service Design & Build Client Countrywide Residences Construction Period 2017-2019 Value $38M Architect +MAP Architects Engineer DHC Consulting Project Details Design & Build Consists of a 5-level main building, (43 apartments with 4 penthouse suits on the top...
Apartments – Thompson Park

Apartments – Thompson Park

Service Design & Build  Client Box Properties Construction Period January 2014 – March 2016 Value $28M Architect Creative Arch Engineer DHC Consulting Project Details   2016 ADNZ Resene Architectural Design Award     Winner of Multi-unit...
32 Oxford Terrace – Christchurch

32 Oxford Terrace – Christchurch

Service Design & Build Client Countrywide Group Construction Period August 2014 – September 2015 Value $18M Architect +MAP Architects Engineer DHC Consulting Project Details Design & Build5,500sqm of A-grade office space on upper 4 levels over 1,300sqm...
Vulcan Steel – Christchurch

Vulcan Steel – Christchurch

Service Design & Build Warehouse Client Vulcan Steel Construction Period 2016 Value $11M Architect AQUA Architecture Engineer DHC Consulting Project Details Design & Build10,000sqm factory and 400sqm office.Clearwater worked closely with Vulcan Steel Ltd and...