Service
Design & Build
Client
Box Properties
Construction Period
January 2014 – March 2016
Value
$28M
Architect
Creative Arch
Engineer
DHC Consulting
Project Details
2016 ADNZ Resene Architectural Design Award
|
- Winner of Multi-unit Dwelling category-“providing a credible solution to a complex pressing problem and a step in the evolution of urban living in New Zealand.”
- Design & Build
- A new build that consisted of 2 levels of basement car parking, landscaped podium and two 5 level towers with 107 apartments.
- Bridging walkways on the upper levels interlinking the two towers
- Clearwater was responsible for coordinating the full design, build and delivery of the project, which was completed ahead of schedule