Nixon Central – Kingsland

Service

Design & Build  (Structure & Services)

Client

Central 8 Trust

Construction Period

August 2016 – July 2017
(2 stages)

Value

$7.3M

Architect

Paul Brown Architects

Engineer

DHC Consulting

Project Details
  • Design & Build (Structure & Services)
  • A small site in a prime location close to Kingsland’s transport hub has yielded a compact development of 16 two bedroom apartments over 4 levels, which maximises height and density opportunities in this mixed-use zone.
  • Structure consisted of structural steel, precast concrete panels and a ribbon infill flooring system
  • On the exterior, a hard-wearing industrial palette of painted precast panels, timber soffits and metal privacy screens offer design solutions which are both practical and distinctive.
  • Project completed 1 month ahead of schedule