Projects

Greenlane Office Building

Service

Construction

Client

Kimberley Trust

Construction Period

2018 onwards (staged)

Value

$24M

Architect

Brewer Davidson

Engineer

Thorne Dwyer

Project Details
  • Construction
  • Stage 1 – Basement parking and podium levels
  • Stage 2 – 4 level office tower (4,000sqm)
  • Early contractor involvement (ECI) – Clearwater offered up a number of Value Engineering options which assisted the client in ensuring a cost effective project was delivered
  • Clearwater completed the foundations, basement and suspended floor concrete works with own direct labour
  • Managed and co-ordinated other trades including excavation, piling, precast concrete, structural steel, curtain wall, aluminium composite panels and metal roof installation