
Service
Interior Fitout
Client
Kakariki Hospital Ltd
Construction Period
January 2023 – March 2024
Value
$32M
Architect
Klein Ltd
Engineer
Beca
Project Details
- Adaptive reuse/retrofit of an office building to a hospital
- Installation of building, medical and gas services into ceiling space with plenum dept limitations
- Strengthening steel floor beams over 4 levels to support the increased floor loadings
- Laying 1,000sqm of 20mm screed to create falls for showers in 20 suites
- Installation of 3 additional hospital lifts
- Client reference- click to follow link

