3 Basque Rd – Auckland

Service

Design & Build

Client

Dawven Limited

Construction Period

May 2012 – March 2013

Value

$2.6M

Architect

Architects Pacific Environments

Engineer

DHC Consulting

Project Details
  • Design & Build
  • Clearwater added two floors to an existing 2 level structure to create four floors of apartments at 300m² each to suit 36 one-bedroom studio style apartments, with an undercroft car park.
  • The design and construction was made complicated by the need for increased dimensional accuracy to ensure the new steel structure and concrete floors lined up with the existing building